PPES Works(Sarawak) Sdn Bhd

 
Water Works
Sarikei Regional Water Supply
Awarded by JKR Sarawak at a contract value of RM21.8 million, this project involves construction of a 21.45 km trunk main pipe, distribution mains, three service reservoirs, and a booster pumping station located at Bayong water treatment headworks.


Gerugu Dam
Contract value: RM67.199 mil
Client: JKR Sarawak
This RM67 million proposed dam, with access road and ancillary facilities, is part of the Sarikei Regional Water Supply network in Sarawak.



Tanjung Manis - Pulau Bruit Water Supply

This turnkey contract, valued at RM40.2 million is for the design, construction and completion of water pipeline and ancillary works, from Sekumang, Tanjung Manis to Kampung Saiee, Pulau Bruit in Mukah Division was awarded by the Ministry of Rural and Regional Development in June 2005 to a joint venture of PPESW Works and WJ Construction Sdn Bhd.

This rural water supply project consists of a water pipe system that runs over a distance of 46.2 km. Also included is the construction of underwater pipe systems across 3 rivers, namely Batang Paloh over a distance of 1.4 km, Sungai Belawei over a distance of 0.5 km, and at Sungai Loba Pulau over a distance of 0.3 km.



Tanjung Manis Water Supply, Mukah Division
Contract value: RM41.50 mil
Completed: 1994
Client: JKR Sarawak
 

Sarikei Regional Water Supply Short Term Improvement Works, Sarikei Division
Contract value: RM19.90 mil.
Completed: 1998
Client: JKR Sarawak
 

Elevated RC Water Towers, Universiti Malaysia Sarawak (UNIMAS) in Kota Samarahan
Completed in 2002, the water towers are the tallest in Sarawak, measuring 65 and 68 m in height, respectively.




Miri Water Supply Expansion Scheme (Phase II) Awarded by JKR Sarawak at a contract value of RM89.90 million, this project was completed in 2000. A 2.2 km tunnel was constructed to transfer raw water from Sungai Bakong to Sungai Liku Treatment Plant.
 

Miri Water Supply Expansion Scheme (Phase II)

Awarded by JKR Sarawak at a contract value of RM89.90 million, this project was completed in 2000. A 2.2 km tunnel was constructed to transfer raw water from Sungai Bakong to Sungai Liku Treatment Plant


Batu Kitang Treatment Plant (Module 6), Kuching Division
Contract value: RM21.34 mil.
Completed: 2000
Client: Kuching Water Board

Belawai Water Supply, Mukah Division
Contract value: RM10.83 mil.
Completed: 2000
Client: JKR Sarawak
 

Dalat Water Supply, Mukah Division
Contract value: RM4.98 mil.
Completed: 2000
Client: JKR Sarawak




   
This site is best viewed at 800x600 resolution with Internet Explorer 5.0 or above.
Copyright © 1996-2007 Cahya Mata Sarawak Berhad. All rights Reserved.